Day 4 – Sanding the Berrien chassis, Removing diamond plate floor pan


Today, I spent a little more time sanding the Berrien sand rail chassis. I was also able to roll the frame onto it’s side. Then I sprayed some PB Blaster penetrating oil onto the nuts and bolts holding the diamond plate floor pan on the frame. After a few minutes, I was able to easily remove the sand rail floor pan. Here are some pics of today’s progress.

10362378_10153221076804492_2614450063509418741_n11933483_10153221076719492_771401493724451026_n11949457_10153221076694492_1887666427158213220_n11934984_10153221076644492_2180064109566947231_n11937922_10153221076689492_1291073939811323414_n11988492_10153221076569492_174634654647086950_n11060905_10153221076539492_880041102475118972_n (1)


Share This:
twitterreddittumblr

Comments

comments

Translate »